Sewer rehabilitation Zurich - trenchless, durable, documented
Inliner, spraylining and burstlining for sewers in need of rehabilitation in the city and canton of Zurich. 50+ year lifespan, GSchV-compliant documentation, quote before dispatch.
Sewer rehabilitation in the city and canton of Zurich - trenchless instead of excavation
Zurich has one of the oldest sewer infrastructures in Switzerland. In the old town, in Aussersihl, Wiedikon and Wipkingen you find lines from 1880 to 1960 - stoneware pipes with offsets, cracks and root ingress from the old tree alleys. In the Lake Zurich municipalities and the Zurich Oberland districts, properties from the 1950s to 1970s are largely no longer in their original state. That building stock needs rehabilitation - but excavation is out of the question for most owners for three reasons: cost, construction time, and the restoration of the surface and the garden.
Greentech Solutions therefore focuses on trenchless processes: inliners for entire line segments, spraylining for long runs with corrosion damage, short liners for point repairs. With decades of proven technology and lifespans of 50 years and more, this is the economic answer to ageing infrastructure - without the classic building chaos around the property.
The principle behind it is simpler than it sounds: the old pipe stays in the ground and gets a new one inside it. A resin-impregnated liner is drawn in via the existing shaft, pressed against the pipe wall and cured in place. What remains is a smooth, seamless pipe inside the old pipe - watertight over the full length, without a single spade cut in your garden or driveway.
Which process for which damage?
Inliner (cured-in-place pipe)
A resin-impregnated woven liner is drawn into the old pipe and cured. Result: a seamless new pipe inside the old one. For entire line segments (5-50 m), DN 100 to DN 1200. Lifespan 50+ years.
Spraylining
Spray-applied special resin on the pipe wall. Ideal for long lines with surface corrosion or lime attack. Lower material demand than an inliner, faster curing.
Short liner
Local repair of individual damage points (cracks, offsets, root ingress). A resin-impregnated patch is placed exactly on the damage. Efficient when the remaining pipe condition is intact.
Burstlining / open-cut rehabilitation
For complete structural failure or a change in cross-section. Burstlining breaks the old pipe and pulls a new one through, open-cut exposes and replaces. We use these only when trenchless is no longer viable.
Quick overview: which process, when?
| Process | When it fits | Typical damage pattern |
|---|---|---|
| Inliner | Whole line segments with multiple damages | Cracks, offsets and root ingress over longer runs |
| Spraylining | Long lines with surface damage | Corrosion and lime attack on the inner pipe wall |
| Short liner | Point repair of individual defects | Single crack, offset or root ingress in an otherwise intact pipe |
Which process fits your case is decided after the TV camera survey (SN EN 13508-2) and damage classification - not upfront over the phone.
Typical damage patterns in Zurich sewers
Root ingress (common in the old town, the Gold Coast and Lake Zurich)
Linden, chestnut and oak trees and shore vegetation find ideal conditions in the damp sewer ground. Roots penetrate leaky joints, widen cracks and block flow. Inliners or short liners close the ingress points durably.
Offsets and cracks (old-town districts, slope locations)
Settlement from ground movement, vibrations from tram and rail traffic, frost damage in shallow lines. With multiple offsets an inliner is the most efficient solution - it conforms to the pipe geometry and restores watertightness.
Corrosion and lime scale (Lake Zurich region, old Eternit lines)
The hard Lake Zurich water, combined with material fatigue in old concrete or Eternit lines, causes material loss and rough inner surfaces over the years. Spraylining restores a smooth, corrosion- resistant inner surface.
Chemical and grease residues (industry, gastronomy, workshops)
In commercial and industrial areas (Zurich west, Schlieren-Limmat valley, Glatt valley), grease, oil and chemicals attack the pipe material. Here we combine inliners with special resins that resist the specific chemical loading.
Established with the authorities, economical for owners
Trenchless rehabilitation is not a niche in Zurich. The city of Zurich describes lining in its guidance on the rehabilitation of private drainage systems as a proven procedure that ensures durable, watertight lines. And the cantonal specialist offices confirm that private drain lines must be monitored and maintained just as regularly as the public network. Trenchless rehabilitation therefore uses a method that authorities know, verify and accept - including leak testing after completion.
The economics come mainly from what is avoided: no surface break-up in front of the house, no garden restoration, no weeks of makeshift arrangements on the driveway. Instead of an open construction site over weeks, trenchless rehabilitation typically takes just a few working days, often only one for house connections. What it costs in your case we tell you in writing after the TV inspection - before any rehabilitation, not after.
Permit, documentation and insurance
Pure rehabilitation without a change in cross-section is generally not subject to permit in the canton of Zurich - the measure preserves the existing pipe run. For larger interventions or new installations, the municipality or AWEL (cantonal environment office) is competent. We support communication with the authorities with GSchV-compliant documentation: before and after camera surveys, damage classification, evidence of materials and process, and an acceptance protocol.
In the case of an insured event (typically a backflow water damage in the basement, or root damage with follow-on damage in the property), building and contents insurance often cover part of the rehabilitation cost. We provide all necessary documents - damage report, findings video, quote with process rationale, final protocol - prepared directly for the insurer.
Rehabilitation hotspots in the canton of Zurich
In these 8 cities we run rehabilitation projects most often - building stock age, slope locations and industrial wastewater make them the rehabilitation hotspots of the canton:
So funktioniert es
Unser bewährter Prozess - transparent und effizient von Anfang bis Ende.
- 1
TV inspection and findings
Camera survey to SN EN 13508-2, damage classification and process recommendation. You see the condition yourself and decide with the facts in hand.
1 - 2
Quote before rehabilitation
A written detailed quote with process, materials, time frame and cost range. No middleman mark-up, no surprise price.
2 - 3
Pre-cleaning
High-pressure cleaning of the line to remove all deposits - a prerequisite for a flawless rehabilitation result.
3 - 4
Process installation
Inliner insertion, spraylining application or short liner - depending on the damage pattern. For inliners, a resin-impregnated liner is drawn in and fitted precisely.
4 - 5
Curing
UV-light or steam curing inside the pipe. The result is a new, seamless pipe inside the old one - without excavation.
5 - 6
Acceptance and documentation
Final camera check, handover of the rehabilitation report with warranty documents - documented in a form suitable for authorities and insurers.
6
Who is this for?
Private households
Cracks, root ingress or leaking pipes? With the inliner process we rehabilitate your sewer without breaking up the garden or the driveway. Quote before dispatch, no middleman.
Property management
Preserve the value of your property with documented rehabilitations. Maintenance plans, reports suited to cantonal reporting, consolidated billing per property.
Industrial / gastronomy
Rehabilitation of drain systems in industrial and commercial properties, resistant to grease, oils and chemicals. GSchV-compliant documentation for the authorities included.
Your benefits
We combine technical expertise with transparency — so you always know what to expect.
- Quote before rehabilitation - no middleman mark-up, no surprise price
- Trenchless via inliner or spraylining - no surface works, no garden dig-up
- 50+ year lifespan documented - corrosion-resistant material
- Process selection by damage pattern - inliner, spraylining, short liner or burstlining
- Diameters DN 100 to DN 1200 - house connection to main line
- GSchV-compliant documentation - suitable for insurance and authorities
PDF DOWNLOAD
Construction-project checklist — sewer works
Standards, cost ranges, hand-over checklist and maintenance intervals — 12 pages of practical know-how for your next project.
Häufige Fragen
How much does sewer rehabilitation in Zurich cost?
Cost depends on line length, pipe diameter, damage severity and access conditions. A short house-connection inliner is in a different price range than the rehabilitation of a municipal main. You receive a written cost estimate after the TV inspection, before any rehabilitation.
What is the inliner process?
In the inliner process, a resin-impregnated liner is drawn into the damaged pipe and cured on-site with UV light or steam. The result is a new, seamless pipe inside the old pipe - without excavation. Suitable for diameters DN 100 to DN 1200.
When do I need an inliner, spraylining or a short liner?
Inliner for whole line segments with multiple damages, spraylining for long lines with surface corrosion, short liner for point defects such as single cracks or offsets. In cases of complete structural failure, open-cut rehabilitation is used. We recommend the best method after the TV inspection.
How long does a rehabilitated pipe last?
Correctly installed inliners have a documented lifespan of 50 years and more. The material is corrosion-resistant and durable against chemical influences, and the original flow diameter is largely preserved.
Does sewer rehabilitation in the canton of Zurich require a permit?
For pure rehabilitation without a change in cross-section, usually not - the measure preserves the existing pipe run. For larger interventions or new installations, contact your municipality or AWEL, the cantonal environment office. We support communication with the authorities with GSchV-compliant documentation.
Does the building insurance cover the cost?
In the case of an insured event (for example a backflow water damage), building or contents insurance often covers part of the rehabilitation cost. We provide all necessary documents - damage report, camera survey, quote, protocol - for your insurance.
How long does a rehabilitation take?
A short inliner rehabilitation of a house connection is often done in one day. For longer lines or several rehabilitation segments, it can take two to five days. You receive a schedule with a completion date in advance.
Which processes make sense for older Zurich properties?
In older buildings in the Altstadt, Aussersihl, Wiedikon and Wipkingen we often find stoneware lines from 1880-1960. For these, inliner processes are ideal: no disturbance to the building fabric, no excavation under heritage-protected streets, and the same pipe run is preserved.
Do you also serve municipalities and public sewer networks?
Yes, we rehabilitate public sewer networks for municipalities in ZH, AG, ZG, TG, SH and LU. Framework agreements with predictable annual rehabilitation budgets, GSchV-compliant documentation, reports suited to cantonal reporting.
How does rehabilitation differ from cleaning?
Cleaning removes deposits - the pipe condition is unchanged. Rehabilitation repairs structural damage (cracks, offsets, corrosion) and restores watertightness. A TV inspection determines what is needed. Often we recommend cleaning plus inspection as the first step.
Jetzt kostenlose Offerte anfragen
Unverbindlich und innerhalb von 24 Stunden
Dringend? Rufen Sie uns direkt an - wir sind 24/7 erreichbar.
044 500 92 05 24/7 Notfalldienst