Skip to content
Municipalities & cantons

Sewer service for municipalities, cantons and public entities

Greentech Solutions is a long-term partner for municipalities and cantons across German-speaking Switzerland. Framework contracts for maintenance, inspection and rehabilitation of the public sewer network - GSchV compliant, SN EN certified, 24/7 available. Swiss family business, no middleman, quote before dispatch.

The public sewer network is one of the most important - and at the same time most invisible - pieces of municipal infrastructure. When it works, nobody talks about it. When it does not, backflow damage, odour nuisance and environmental impact quickly hit the works commission agenda. We support municipalities in Zurich, Aargau, Zug, Thurgau, Schaffhausen and Lucerne in the value preservation of their sewer assets - with framework contracts for maintenance, periodic inspection and staged rehabilitation.

What sets us apart from classic providers: we think in multi-year programmes rather than individual jobs. You get one point of contact, GSchV-compliant documentation without mark-up, an annual activity report for the municipal council or works commission, and predictable rehabilitation budgets instead of emergency surprises. SN EN 1610 certified for laying, SN EN 13508-2 for inspection - all proofs available directly for your submission dossier.

Our condition assessments are delivered so they flow directly into your general drainage plan (GEP) and your sewer register. In storm situations you reach our on-call service around the clock without going through a switchboard. Transparent invoicing per line item, no hidden costs.

Framework contract types

Three framework contract models cover the needs of small to large municipalities. Combinable and adaptable to public procurement requirements.

Maintenance framework contract

Periodic jetting and visual inspection

  • Annual programme with jetting sequence by neighbourhood or street
  • Visual inspection of shafts and discharge points
  • Standard-compliant job reports
  • Emergency priority in case of blockage

Standard contract for small to mid-size municipalities with periodic maintenance needs.

Inspection framework contract

Condition assessment plus rehabilitation planning

  • CCTV camera survey to SN EN 13508-2 across staged sections
  • Damage classification Z0 to Z5
  • GIS-compatible finding export for the municipal sewer register
  • Rehabilitation prioritisation with cost forecast

For municipalities building or refreshing their sewer register.

Full-service framework contract

Maintenance, inspection, rehabilitation

  • Maintenance plus inspection plus short-liner or inliner rehabilitation budget
  • 24/7 emergency readiness with guaranteed response time
  • Annual reporting for the municipal council or works commission
  • Support during GSchV audits and communication with authorities

For mid-size and larger municipalities with a continuous rehabilitation workload.

Your advantages as a municipality

GSchV-compliant documentation

All tests and inspections are documented in line with the Swiss Water Protection Ordinance (GSchV) - audit-safe for your cantonal reporting.

Systematic condition assessment

Structured stocktake of the public sewer network with CCTV inspection to SN EN 13508-2, damage classification and prioritised reporting.

Rehabilitation prioritisation

Based on the condition assessment we produce a prioritised rehabilitation plan - so your budget is spent where it is needed most.

Long-term partnership

We support municipalities and cantons over years - as a reliable partner for ongoing maintenance, multi-year rehabilitation programmes and out-of-hours emergencies.

GSchV compliance and cantonal reporting

The Swiss Water Protection Ordinance (GSchV) requires municipalities to monitor their wastewater assets regularly - leak testing after site acceptance, periodic condition assessment, documented rehabilitation measures. Our reports are set up in the format cantonal authorities (AWEL Zurich, BVU Aargau, DAR Lucerne and others) expect to see during audits: damage class, measure, date, responsible person, evidence.

Cantonal reporting data is delivered in a GIS-compatible format matching your cantonal IT requirements. For most common sewer-register systems (Topobase, KASUS, GEOWASTL and custom municipal solutions) we align the export formats with your building department before contract start.

All proofs (SN EN 1610 for laying, SN EN 13508-2 for inspection, GSchV compliance statements) are available in our submission template - ready as an attachment to your tender documents.

What we tell public procurement leads

Four lessons from public tender processes in German-speaking Switzerland - regardless of whether we bid or advise:

Clear quantity specification

Line length per material, number of shafts, rehabilitation volume in linear metres and kilograms per method. The more precise the quantities, the more comparable the bids.

Standard references

SN EN 1610 (laying), SN EN 13508-2 (inspection), GSchV (leak tightness). Bidders must provide certificates and proofs - otherwise exclusion.

Explicit emergency SLA

Response time in hours, availability on weekends and holidays, deputy arrangement when the main lead is unavailable.

Transparent switching costs

Takeover of existing sewer-register data, documentation migration, handover period. Often forgotten items - we supply a dedicated line item for them.

Common damage patterns in the public sewer network

The damage patterns we most often encounter in municipal networks - and how we prioritise them after classification:

Root ingress (Z1-Z3)

Above all along streets with old tree alleys. Classified by flow impact. Z1-Z2: routine root removal with a specialised cutter nozzle. Z3: short liner to seal the entry point.

Offsets and settlement damage (Z2-Z5)

Common on slopes, at shaft connections or under heavy traffic. Z2-Z3: inliner for longer sections. Z4-Z5: trench rehabilitation or pipe bursting on structural failure - rare, but seen on old stoneware main lines.

Material corrosion (Z2-Z4)

Old concrete and Eternit lines, above all at transitions and in areas with aggressive wastewater constituents (industrial or commercial discharge). Spraylining restores a corrosion-resistant inner surface - the most economical solution where the structural shell is still intact.

Sludge and grease deposits (Z0-Z2)

Maintenance rather than rehabilitation. Common in residential neighbourhoods with apartment buildings and in commercial zones. Regular jetting under the maintenance framework contract substantially reduces the risk of backflow damage.

Reference mandates with municipalities

Inspection framework contract, Aargau municipality

18 km of public sewer network, CCTV camera survey staged over 3 phases. Damage classification Z0-Z5 with GIS export for the existing sewer register. Prioritised rehabilitation roadmap as a basis for the works commission session.

Full-service framework contract, Limmat valley municipality

Multi-year framework contract with an annual jetting programme, an annual activity report for the municipal council and a short-liner rehabilitation budget per year. Predictable annual budgets replaced the unplanned emergency spend of the previous years.

Maintenance framework contract, Zurich Oberland municipality

Periodic jetting in 3 phases per year, coordinated with the building department, shaft inspection to SN EN 13508-2. Cantonal reports for the cantonal filing. Additional 24/7 emergency readiness.

Common questions from municipalities

What does a maintenance contract with a municipality cost?

The cost depends on network length, method depth and dispatch frequency. A municipality with 10 km of public sewer network and an annual jetting need sits in a different range from a city with 100+ km. Before contract signing we prepare a written detailed quote with clear service positions and unit prices per linear metre or shaft.

Are you GSchV compliant and audit-ready?

Yes. All reports are prepared in line with the Swiss Water Protection Ordinance (GSchV). Cantonal data is exported in the formats your municipality requires - we align with your works commission or building department before contract start.

Which certifications do you hold?

SN EN 1610 certified (laying and testing of wastewater lines), SN EN 13508-2 for CCTV camera surveys with damage classification. On request we deliver all current proofs directly for your submission dossier.

How do you respond to emergencies outside office hours?

Under full-service contracts we guarantee a 24/7 response within 60 minutes in the cantons of Zurich, Aargau, Lucerne and Zug, and 90 minutes in Thurgau and Schaffhausen. Contract hotline with direct on-call, no routing through a call centre.

Can we import your reports into our sewer register?

Yes. We deliver damage findings in GIS-compatible formats (Shapefile, GeoJSON) for common sewer-register systems (Topobase, KASUS, GEOWASTL, custom municipal solutions). If your software needs a different format, we clarify that in the pre-briefing.

Do you take over ongoing rehabilitation programmes?

Yes. Handover typically takes 30-60 days - review of existing sewer register, damage documentation, current supplier contracts. We actively coordinate with the previous provider when handover information is required.

What does your reporting to the municipal council look like?

As standard we deliver an annual written activity report for the municipal council or works commission: jobs by neighbourhood, identified damage with classification, recommendations for the following-year budget, GSchV compliance status. On request additional quarterly reports or special sessions.

Which methods do you use for rehabilitating public sewers?

Inliner (cured-in-place lining) for whole line sections, short liners for point damage, spraylining for long corrosion stretches, pipe bursting or classic trench rehabilitation only where the structure has failed. Which method we recommend is decided after damage classification - not flat-rate upfront.

Request a framework contract

Send us the key data of your sewer network (length, material, history) - we prepare a written detailed quote or a submission-ready proposal within 5 working days.

Request a detailed quote
Anrufen Kanal-Vorsorgekontrolle